top of page
269106221_2720439071422161_5794767967678907532_n.jpg

Completed Projects

AEC has had the honor to work within our local community and school system, as well as neighboring communities

Candlewood Suites.jpg

Candlewood Suites

Aberdeen Proving Ground

Out of the ground 60,000 square foot, 4 story, 69 guestroom hotel. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generators, lightning protection, surge protection devices, and fire alarm installation.

Riverside Elementary School

Harford County Public Schools

Replacent of Generator

Riverside Elementary School.heic
Havre de Grace.JPG

Havre De Grace Middle/High Scool

Harford County Public Schools

New construction of approximately 240,000 square foot. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generators, lightning protection, surge protection devices, fire alarm installation, and much more.

Ravens Stadium

Maryland Stadium Authority

Baltimore Ravens Stadium suite renovations. AEC provided demolition and the installation of lighting fixtures, lighting controls, and receptacles.

7thumbnail.jpg
Govans Elememtary.jpg

Govans Elementary School

Maryland Stadium Authority
Baltimore City Public Schools

New school construction of approximately 87,260 sqft. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generator systems, lightning protection, surge protection devices, and fire alarm installation.

Medfield Heights Elementary School

Baltimore City Public Schools

New construction of approximately 80,000 square-foot. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generators, lightning protection, surge protection devices, fire alarm installation, and much more.

5.jpg
george-cromwell-elementary-entrance edited.png

George Cromwell Elementary School

Anne Arundel County Public Schools

70,000 square-foot renovation of the George Cromwell Elementary School. Including demolition of existing light fixtures, receptacles, fire alarm system. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generator systems, lightning protection, surge protection devices, fire alarm installation.

Calverton Elementary/Middle School

Maryland Stadium Authority
Baltimore City Public Schools

Demolition of the existing 266,000 square foot concrete and brick structure and replaced with a new 121,000 square foot 2-story school building. Demolition and installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generators, lightning protection, surge protection devices, fire alarm installation, and much more.

Calverton Elementary Middle.jpg
UMCP SPP.jpeg

University of Maryland

School of Public Policy

70,000 square-foot building offers state-of-the-art teaching and collaborative spaces for students, faculty and staff. Installation of conduit work, lighting, switchboards, panelboards, circuit breakers,  wiring systems, generators, lightning protection, surge protection devices, fire alarm

bottom of page